Fill in a Valid Nebraska 2 Form Open Nebraska 2 Editor Now

Fill in a Valid Nebraska 2 Form

The Nebraska 2 form, officially known as the Notice of Intent to Drill or Re-Enter, is a crucial document that must be submitted to the Nebraska Oil and Gas Conservation Commission before any drilling or re-entering activities can commence. This form requires detailed information about the proposed work, including the type of well, location, and drilling parameters. Timely submission is essential to ensure compliance and avoid delays; fill out the form by clicking the button below.

Open Nebraska 2 Editor Now
Outline

The Nebraska 2 form, formally known as the Notice of Intent to Drill or Re-Enter, serves as a critical document in the oil and gas industry within the state of Nebraska. This form must be submitted to the Nebraska Oil and Gas Conservation Commission before any drilling or re-entering activities can commence. It outlines essential details about the proposed work, including whether the operation involves drilling a new well, re-entering an existing well, or drilling a horizontal or directional well. Key information required on the form includes the type of well—whether it is for oil, gas, or injection purposes—along with the operator's contact information, well location, and specifics about the lease. Additionally, the form asks for the proposed measured depth and true vertical depth of the well, as well as the anticipated start date for drilling. The Nebraska 2 form also details the casing and cementing program, specifying the hole size, casing size, and the volume and type of cement to be used. Operators must ensure that all necessary fees, survey plats, and additional forms, such as the Form 2A for temporary earthen reserve pits, accompany the submission. Approval from the Commission is mandatory, and the form must be signed by the operator or their agent, indicating their commitment to adhere to the regulations set forth by the Commission. Overall, the Nebraska 2 form plays a pivotal role in ensuring that drilling activities are conducted safely and in compliance with state regulations.

FAQ

What is the purpose of the Nebraska Form 2?

The Nebraska Form 2 is a notice of intent to drill or re-enter an oil or gas well. It must be submitted to the Nebraska Oil and Gas Conservation Commission before any drilling or re-entry work begins. This form ensures that the Commission is aware of the proposed activities and can evaluate them for compliance with state regulations.

Who needs to submit the Nebraska Form 2?

The operator of the well, or their authorized agent, is responsible for submitting the Nebraska Form 2. This individual must provide accurate and complete information about the proposed drilling or re-entry activities.

What information is required on the Nebraska Form 2?

The form requires various details, including the type of work (drill, re-enter, or drill horizontal), the type of well (oil, gas, or injection), the well location, elevation, and the proposed casing and cementing program. Specific measurements, such as distances from section lines and the proposed depths, must also be included.

Is there a fee associated with submitting the Nebraska Form 2?

Yes, there is a requisite fee that must accompany the submission of the Nebraska Form 2. Additionally, a survey plat for the location and Form 2A, which is a permit application for a temporary earthen reserve pit, should also be included.

What happens after the Nebraska Form 2 is submitted?

Once submitted, the Nebraska Oil and Gas Conservation Commission reviews the form. If everything is in order, the Commission will grant approval, and the operator will receive a permit number. The operator must not proceed with drilling or re-entry until they have received this approval.

What is the significance of the bond mentioned in the Nebraska Form 2?

The bond serves as a financial guarantee that the operator will comply with state regulations and restore the site after drilling is completed. Operators can choose between a “One Well” bond or a blanket bond, depending on their needs and the number of wells they operate.

What should an operator do if they need to make changes after submitting the Nebraska Form 2?

If changes are necessary after submission, the operator must contact the Nebraska Oil and Gas Conservation Commission to determine the appropriate steps. Depending on the nature of the changes, additional documentation or a revised Form 2 may be required.

Additional PDF Forms

Documents used along the form

When submitting the Nebraska Oil and Gas Conservation Commission Form 2, several other forms and documents are often required to ensure compliance with state regulations. These additional documents help provide a comprehensive understanding of the proposed drilling activities and facilitate the review process. Below is a list of commonly used forms that accompany the Nebraska 2 form.

  • Form 2A: Permit Application for a Temporary Earthen Reserve Pit - This form is necessary for obtaining permission to construct a temporary earthen reserve pit, which is used to store drilling fluids and other materials. It includes details about the pit's location, dimensions, and intended use.
  • Form 1: Application for Permit to Drill - This document serves as a formal request for permission to drill a well. It outlines the specifics of the proposed drilling operation, including the well type, location, and operator information, ensuring that all necessary details are submitted for review.
  • Form 3: Completion Report - After drilling is completed, this form must be submitted to report the results of the drilling operation. It includes information about the well's production capabilities, the formations encountered, and any completion activities undertaken.
  • California Civil Form - Essential for legal proceedings, this form facilitates various applications within California's civil court system, including https://formcalifornia.com/editable-california-civil-form/ for filing lawsuits and responding to complaints.
  • Form 4: Application for Permit to Inject - If the drilling operation involves injection activities, this form is required. It details the purpose of the injection, the type of fluids to be injected, and the geological formations involved, ensuring compliance with environmental regulations.
  • Bond Documentation - A bond is typically required to ensure that the operator can cover potential liabilities associated with the drilling operation. This documentation may include a "One Well" bond or a blanket bond, depending on the scope of the operations and the number of wells involved.

Each of these forms plays a vital role in the regulatory process, helping to protect both the environment and the interests of local communities. It is essential to ensure that all necessary documents are completed accurately and submitted in a timely manner to avoid delays in the approval process.

Instructions on Writing Nebraska 2

After gathering the necessary information, you can begin filling out the Nebraska 2 form. Make sure to provide accurate details to ensure compliance with regulations. Follow these steps to complete the form properly.

  1. Indicate the type of work you are planning: Drill, Re-enter, or Drill Horizontal or Directional Well.
  2. Specify the type of well: Oil, Gas, or Injection.
  3. Fill in the operator's name, telephone number, and address.
  4. Provide the name of the lease, well number, and field and reservoir (state "wildcat" if applicable).
  5. Record the elevation (ground level) of the well.
  6. Complete the well location section, including the county and quarter-quarter section.
  7. Detail the surface location of the well by indicating the footage from the section lines (N, S, E, W).
  8. If applicable, provide the bottom hole location for directionally drilled wells, including the same footage details.
  9. Input the latitude and longitude of the surface location in degrees.
  10. State the nearest distance from the proposed location to any property or lease line.
  11. Indicate the number of acres in the lease.
  12. Provide the distance from the proposed location to the nearest drilling, completed, or applied for well on the same lease.
  13. List the number of wells on the lease, including the one you are proposing.
  14. Fill in the proposed measured depth and true vertical depth in feet.
  15. Specify the deepest formation to be penetrated.
  16. Provide the approximate start date for drilling.
  17. Include the drilling contractor's name.
  18. Outline the proposed casing and cementing program, including purpose, hole size, casing size, weight, grade, and setting depth.
  19. Detail the cement volume and type, including the estimated top of cement in feet.
  20. State the status of the bond by checking the appropriate box for the bond type.
  21. Sign the form as the operator or agent and provide your title and approval date.
  22. Indicate whether a sample cut is required by the Nebraska Geological Survey.
  23. Attach the requisite fee, survey plat for the location, and Form 2A.